A Legacy of Leadership in Demolition

With over six decades of experience, D.H. Griffin has built a national reputation for handling the most challenging demolition projects in dense, high-traffic environments. Our team is uniquely equipped to manage building removal in tight urban settings where safety, coordination, and precision are critical.

 

For projects involving close proximity to occupied structures, active roadways, and pedestrian zones, we implement detailed protection and control plans tailored to each site. This includes engineered traffic and pedestrian control systems, site-specific safety barriers, and phased demolition sequencing to minimize disruptions and ensure public safety.

Our capabilities for urban demolition projects include:

  • Traffic and pedestrian protection & control
  • Dewatering and site water management
  • Limited structural shoring to maintain integrity during demolition
  • Selective abatement performed in compliance with regulatory standards
  • Precision mechanical demolition in tight quarters
  • Vibration and impact monitoring near adjacent structures

 

Every project begins with comprehensive planning and risk assessment, followed by strategic execution using our fleet of specialized equipment and highly trained personnel. Whether it's a single-story commercial structure or a multi-story facility within a confined downtown block, D.H. Griffin delivers safe, efficient, and compliant demolition solutions with minimal disruption to the surrounding environment.

Project Highlights

Skanska Capitol Tower, PH2A/Houston Club Building

Location: Houston, TX

This project entailed the complete structural demolition of two high-rise buildings, an 18-story steel framed structure and a 12-story cast in place concrete structure, both inclusive of full basements. The buildings were located immediately adjacent to a 6-story parking garage, scheduled for demolition.

To facilitate the implosion of 2 towers, while preserving the adjacent structure, DHG executed a targeted separation of two full structural bays from each building totaling 187,000 sf. This separation created the required clearance to mitigate impact to nearby structures and expedite subsequent site redevelopment activities. Both buildings featured exterior masonry facades coated with asbestos containing weatherproofing mastic. Full perimeter scaffolding was erected on the entire exterior to allow for controlled removal of the brick and mastic.

 

Skanska Capitol Tower Project

Former Hospital at Veritas School Campus

Location: Richmond, VA

Multi story demolition of former hospital on Veritas School Campus in Richmond, VA. Work includied environmental package, utility disconection; building separation / protection from adjacent structure on the National Historic Register. Work included separate and protection on (3) levels and the basement. DHG subcontracted inhouse environmental affiliate Demolition & Asbestos Removal Inc. to provide environmental services

 

Veritas School Campus Project

Branch Banking & Trust Towers

Location: Wilson, NC

Demolition and abatement of twin 7-story towers and a mezzanine. Towers were safely imploded on December 19, 2020 using explosive engineering by Pettigrew Inc.

 

BB&T Towers

Lifeway Campus Demolition

Location: Nashville, TN

Prime contractor for 1.4 million sf of demolition across 9 buildings, including a 12-story implosion. Coordinated with environmental agencies to manage rare non-friable asbestos.

 

Lifeway Campus Demolition

Project Riverboat — Charlotte Observer Complex

Location: Charlotte, NC

Demolition of 450,000-sf downtown complex including underground tunnels. Faced complex urban challenges with after-hours operations and street coordination.

 

Charlotte Observer Project

Mary Ellen Jones Building Renovation

Location: Chapel Hill, NC

Removal and replacement of over 59,000 sf of precast panels on an 11-story building. Included installation of 209 new architectural elements totaling over 765,000 lbs.

 

Mary Ellen Jones Building

Dominion Power – 700 Canal Place Construction

Location: Richmond, VA

Imploded in 16.5 seconds using 3,270 lbs. of explosives after months of soft demolition. Cleanup of debris completed by October 2020.

 

Dominion Power Tower

UAB Kracke and Pittman Hall

Location: Birmingham, AL

Demolition of two buildings in tight confines on the UAB campus. Hand-separated 7-story structure from the building to remain. Protected critical utilities and achieved 95% material recycling.

 

UAB Kracke and Pittman

UAB Townhouse

Location: Birmingham, AL

Full abatement and demolition of an 11-story, 113,000 sf masonry building with minimal road closure access using long-reach equipment.

 

UAB Townhouse

VCU Gladding Residence Center 1 and 2

Location: Richmond, VA

Abatement and removal of four 4-story dormitories including underground utilities. Work completed 13 days ahead of schedule despite an extremely tight timeline with daily liquidated damages.

 

VCU Gladding Residence Center