Center Point Terminal Company contracted D. H. Griffin Infrastructure in 2010 to complete the site work and infrastructure package for a nine tank, five acre terminal on the St. Johns River in Jacksonville, FL. Included was the formation and construction of 110' diameter concrete ringwalls for nine tanks and construction of two 20,000 sf sediment holding basins. Infrastructure's work incorporated the construction of a truck terminal area including storm drainage, curbing, asphalt and concrete paving. The fire control system for the site comprised of source piping, fire hydrants and access roads.
Owner/Client:
NCDOT
Project Summary:
• Constructed (9) - 110' diameter ringwalls and (2) - 20,000 sf sediment basins.
• Demolition of existing structures and rough grade and dewater 5 acre site.
• Soils management plan challenging due to lack of suitable soils.
Project Completed:
2009