D.H. Griffin was selected to complete the demolition of the remaining units at the Duke/Progress Turner Power Plant. While the main facility was decommissioned in the late 1990's, a section of the power plant remained to supply energy during peak times. DHG completed the demolition and removal of four (4) peaker units, warehouse, generator step-up transformers(GSU), ancillary structures and components at Duke’s Turner Station. This included the removal of two (2) #6 Fuel Oil Tanks, an abandoned tank, and a service water tank and with associated piping. The site was finish graded and seeded.

PROJECT SUMMARY:

Demolition of four (4) Peaker Units
Demolition of four (4) tanks.
Demolition of GSUs, and all ancillary structures and components
Final Grading and site restoration

OWNER / CLIENT:
Duke Energy

PROJECT COMPLETED:
June 2017 - March 2018