Subcontracted by DHGW, DARI completed asbestos abatement in a 6‐story building in downtown Winston‐ Salem, N.C. The project included asbestos floor tile and mastic, removed ACM pipe insulation from mechanical systems, and exterior transite skin from entire building. Once the skin was removed, remaining ACM fire‐proofing on the exterior structural steel was exposed which required scaffolding the entire building and building a negative pressure enclosure for abatement. DARI also provided the demolition and removal of two connectors to adjacent remaining buildings.