ad on stadium with construction workers

Precision Demolition: Bank of America Stadium Scoreboard Renovation

 

Bank of America Stadium, Scoreboard Demolition
Charlotte, N.C.

D.H. Griffin was contracted by Turner Construction to provide selective structural demolition during this stadium renovation project. Scope of work included the demolition of the two scoreboards leaving the main structural columns and lower levels only; restroom demolition was included to make way for the new AV room. All of the work was performed 200' above stadium seating and concession stands. Very tight timeframe requiring seven-day-a-week schedule. Work completed safely and on time.

Owner/Client:
Turner Construction

Project Summary:

  • Selective demolition of the two scoreboards leaving main structural support columns.
  • Included removal of four (4) restrooms for new AV room.
  • All work at 200' level over stadium seating and concession stands.
  • Very tight timeframe with significant liquidated damages in contract.

Project Completed:

Jan 2014 - Feb 2014
bank of america stadium scoreboard