Project: NC State Carter Finley Stadium, Raleigh, NC


DHG contracted to remove the 10 story West Stands Press Box and support columns. The steel truss system was supported by two poured in place concrete towers with 2 lower floors suspended from the truss. The base of the towers were within 6 ft of the upper elevated seating support bents.