St. Johns River Fuel Terminal Site Work

St. Johns River Fuel Terminal Site Work

Jacksonville, FL

Center Point Terminal Company contracted D. H. Griffin Infrastructure in 2010 to complete the site work and infrastructure package for a nine tank, five acre terminal on the St. Johns River in Jacksonville, FL. Included was the formation and construction of 110' diameter concrete ringwalls for nine tanks and construction of two 20,000 sf sediment holding basins. Infrastructure's work incorporated the construction of a truck terminal area including storm drainage, curbing, asphalt and concrete paving. The fire control system for the site comprised of source piping, fire hydrants and access roads.

Owner/Client:
NCDOT

Project Summary:

  • Constructed (9) - 110' diameter ringwalls and (2) - 20,000 sf sediment basins.
  • Demolition of existing structures and rough grade and dewater 5 acre site.
  • Soils management plan challenging due to lack of suitable soils.

Project Completed:
2009

 

Return to Listing

Information
  • D.H. Griffin Companies
  • 4716 Hilltop Rd.
  • Greensboro, NC 27407
  • 888-336-3366
Shaping America's Skyline
Contact Us
* *
I'm Contacting You About
* Comments
Required Fields*
 
Copyright © 2017 D.H. Griffin. All rights reserved. Website Development by Beacon Technologies, Inc.