Skip to Page's ContentSkip to Main Site NavigationSkip to Site Utility NavigationSkip to Section NavigationSkip to Footer Links

Projects | NCSU, Harrelson Hall

Before:

Harrelson Hall - Before

After:

Harrelson Hall - After

NCSU – Harrelson Hall Abatement and Demolition

Raleigh, NC

Owner/Client:

NCSU / Kimley-Horn and Associates, Raleigh, NC

Video:

Time Lapse Video of Harrelson Hall Demolition

Project Summary:

  • Tight confines on active campus
  • Asbestos abatement and demolition of 125,000 sf circular structure
  • DHG mechanically demolished the structure using a specialty ultra high reach long arm excavator with a 95’ reach
  • Asbestos abatement performed by DHG affiliate Demolition & Asbestos Removal Inc. (DARI) and included textured ceiling plater, TSI, floor tile and mastic, fire doors, window glazing and various asbestos containing mastics
  • Work included site redevelopment by D.H. Griffin Infrastructure, LLC including put back of a courtyard, grading and paving

Project Timeline:

Jan 2016 - March 2017

 

Return to Listing

Information
  • D.H. Griffin Companies
  • 4716 Hilltop Rd.
  • Greensboro, NC 27407
  • 888-336-3366
Shaping America's Skyline
Contact Us
* *
I'm Contacting You About
* Comments
Required Fields*
 
Copyright © 2017 D.H. Griffin. All rights reserved. Website Development by Beacon Technologies, Inc.